Design checklist for a cold storage building — span, eave, crane, panels, doors

Quick answer
The cold storage design checklist is temperature-led: operating temperature per room; panel core and thickness per temperature; door count, type and traffic; floor insulation and slab system; vapour-sealing scope; refrigeration interface and plant position; frame span and eave behind the envelope. The frame items come last on this list because the envelope decisions price the building.
In detail
Blast-freezer and chill rooms in one building mean two panel specifications — draw the temperature map before the panel schedule.
Door positions are process decisions (product flow, forklift routes) with thermal prices attached; place them with the operator, not the draftsman.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a cold storage building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.