EN 10204 3.1 Mill Certificates

Quick answer
A 3.1 mill certificate reports the actual test results — chemistry and mechanical properties — for the specific batch of steel in your building, validated by the mill's independent inspection representative. It is the document that makes steel traceable from heat number to member, and a standard part of the SABER support pack and any serious inspection regime.
In detail
Heat numbers on members should match certificates in the pack — that match is the traceability buyers pay for.
3.2 certificates (third-party validated) exist for higher-demand projects; specify at enquiry.
| Item | What it is | Note |
|---|---|---|
| Type 3.1 | Batch-specific results, mill-validated | Standard |
| Traceability | Heat no. → member → certificate | Required |
Specifying this on your project
Specify this standard in the enquiry by the items in the table above — Type 3.1, Traceability — naming the level, class or certificate type your project requires, and the quotation is built and documented to exactly that. Leave it unnamed and the specification is argued about at inspection instead. The certifications page explains which documents are available on request.
Primary sources
This page rests on the primary sources below — the code authority, the regulator's own platform, the standards body. Check the claim at its source.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
Continue — linked from this page