Standards & compliance · Compliance
EN 1090 — What It Certifies

Quick answer
EN 1090 is the European execution standard for structural steel: part 1 covers CE marking of structural components, part 2 the technical execution requirements, organised in execution classes EXC1–EXC4. It certifies a factory production control system — welding coordination, qualified procedures, traceability — not a single building. Buyers ask for it because it makes fabrication auditable.
In detail
EN 1090 is a fabrication-quality framework; SBC 306 is a design code. A building can be designed to one and fabricated to the other — the combination set out in the SBC 306 guide does exactly that.
This site describes the standard and designs/fabricates in line with its requirements where a project specifies it; the certifications page states plainly what documentation is available and how to request it.
| Item | What it is | Note |
|---|---|---|
| Part 1 | CE marking of components | Conformity |
| Part 2 | Execution requirements | EXC1–EXC4 |
| System | Factory production control | Audited |
Specifying this on your project
Specify this standard in the enquiry by the items in the table above — Part 1, Part 2, System — naming the level, class or certificate type your project requires, and the quotation is built and documented to exactly that. Leave it unnamed and the specification is argued about at inspection instead. The certifications page explains which documents are available on request.
Primary sources
This page rests on the primary sources below — the code authority, the regulator's own platform, the standards body. Check the claim at its source.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.