NDT & Third-Party Inspection (SGS / BV)

Steel sections, connections and components checked to the standard
DESIGN VISUALISATION

Quick answer

The working package: dimensional checks against shop drawings, weld visual inspection with magnetic-particle or ultrasonic sampling per the specified acceptance level, coating dry-film thickness readings, and a packing/container-loading survey — performed in-house and open to third-party inspectors such as SGS or Bureau Veritas at the buyer's instruction. Buyers filter suppliers on exactly this openness (supplier-guide research, 2026).

In detail

Inspection before the balance payment is the normal export rhythm — agree the hold points in the contract.

Remote buyers can combine third-party inspection with dated production photography at each process step.

ItemWhat it isNote
DimensionalAgainst shop drawingsIn-house + 3rd party
Weld NDTVT · MT · UT samplingPer spec level
CoatingDFT readingsPer ISO 12944 system
LoadingPacking & container surveyPre-shipment

Specifying this on your project

Specify this standard in the enquiry by the items in the table above — Dimensional, Weld NDT, Coating, Loading — naming the level, class or certificate type your project requires, and the quotation is built and documented to exactly that. Leave it unnamed and the specification is argued about at inspection instead. The certifications page explains which documents are available on request.

Primary sources

This page rests on the primary sources below — the code authority, the regulator's own platform, the standards body. Check the claim at its source.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.