Standards & compliance · Compliance
SBC 801 — Worker Accommodation

Quick answer
SBC 801 is the Saudi code part covering worker and labour accommodation — space, sanitation, fire and services standards that a camp must meet to be accepted on Saudi projects. For camp buyers it is the compliance differentiator: a layout that already respects SBC 801 room and facility ratios shortens approval and tender scoring.
In detail
Camp quotations should state beds per room, ablution ratios and mess capacity against the code, not just block counts.
Pair this guide with the labour camp hub and the Saudi market page for the full picture.
| Item | What it is | Note |
|---|---|---|
| Covers | Space · sanitation · fire · services | Accommodation |
| Buyer | Contractors housing workforces | Saudi projects |
Specifying this on your project
Specify this standard in the enquiry by the items in the table above — Covers, Buyer — naming the level, class or certificate type your project requires, and the quotation is built and documented to exactly that. Leave it unnamed and the specification is argued about at inspection instead. The certifications page explains which documents are available on request.
Primary sources
This page rests on the primary sources below — the code authority, the regulator's own platform, the standards body. Check the claim at its source.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
Continue — linked from this page