Project cases · Proof / case

Hangar Project Profile — Kenya

Wide-span aircraft hangar with sliding doors and apron
DESIGN VISUALISATION

Reference project profile

This page holds the specification slot for a project of this type in this market. It publishes as a named case study — client, place, year, photographs — when a real project completes. No completed project is claimed here.

Quick answer

This is a reference project profile — the specification a steel hangar for Kenya is quoted and built to. No completed project is claimed here — the named case publishes in this slot on completion. Reference basis: $48–65/m² frame; delivery via Mombasa, then Nairobi–Mombasa corridor (ocean freight China→Africa typically 3–5 weeks).

Reference specification

Span-led buying: the door opening and clear height come first, the frame follows. Reference design 60×40×9 m. Hangar work usually reaches a fabricator through an airport main contractor, not direct.

  • Sliding & vertical-lift doors
  • Space-frame roof
  • Crane & fall-arrest rails
  • Fire suppression interface
ItemReference
Span30–90 m; space frame 80 m+
Eave / height9–18 m at door head
CraneOptional maintenance crane
Steel weight45–70 kg/m² at large spans
Frame band$48–65/m² frame, FOB (space frame)

Delivery to Kenya

The strongest Africa evidence base: a dedicated 2026 Kenya cost guide puts complete installed warehouses at $95–140/m² (KES 12,300–18,200), kits ex-factory at $45–75/m² and frame-only at $22–35/m².

Climate and specification: Coastal corrosion at Mombasa; mild highland climate in Nairobi — coating specification differs by site.

Price this building for your port

Dimensions, destination, crane and cladding scope — send what you have, and the reply is an itemised quotation or one specific question.

Why a profile, not a story

A case page for a hangar in Kenya persuades only when it is verifiable — a named client, a place in Kenya, a year, photographs of the building standing. Until a hangar project completes in this market and the client agrees to be named, the honest content for this slot is the reference specification above. When it completes, this page is rewritten as the case — same URL, real project.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

Do you ship to Kenya?

Yes — Mombasa, then Nairobi–Mombasa corridor: ocean freight China→Africa typically 3–5 weeks. Duty confirmed with your clearing agent.

What does the price for a similar hangar project include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page