Design Service — from Brief to Shop Drawings

Quick answer
Design runs in two passes: approval drawings (general arrangement, sections, foundation reactions) for your consultant and authority route, then shop drawings that drive the line. The design basis — code, loads, grades — is agreed in writing before the first pass, because it decides the tonnage everything else is priced from. Engineering takes 1–3 weeks in the standard programme.
In detail
Where a local engineer of record must stamp the design, our calculation package is issued for their review — agree this route at enquiry.
Design changes after approval re-open the production schedule; the checklist guides exist to freeze the right things early.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.