City & port clusters · Local / logistics
Steel Structures in Cairo & New Cairo

Quick answer
New Cairo, Madinat Nasr and Al Shorouk sit on swelling clays in places — the soil report is a design input, not paperwork. Entry via Sokhna or Alexandria. Design basis for Cairo & New Cairo: Egyptian steel code; local consultant approvals. Ships via Sokhna (ocean freight China→Africa typically 3–5 weeks). The Egypt hub carries the full buying guide.
Delivering to Cairo & New Cairo
The route is fabrication in Cangzhou, container packing in erection sequence, then sea freight to Sokhna — ocean freight China→Africa typically 3–5 weeks — and the inland leg to the Cairo & New Cairo site. The document pack travels with the shipment: drawings and calculations to the design basis above, EN 10204 3.1 mill certificates, welding and inspection records, and a packing list matched to the erection drawings.
Climate and specification: Swelling clays are a known ground condition in New Cairo, Madinat Nasr and Al Shorouk — foundation design must be told the soil report, not assumed.
What to build here
The Egypt hub links the building types with live demand in this market — warehouse and factory first. Start from the type hub for specifications and dated price bands, then bring the Cairo & New Cairo site details (plot, soil, access) to the quotation.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
Do you ship to Egypt?
Yes — Sokhna: ocean freight China→Africa typically 3–5 weeks; Alexandria: ocean freight China→Africa typically 3–5 weeks. Duty confirmed per HS code with your broker.
What does the price for a steel building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page