City & port clusters · Local / logistics
Steel Structures in Manila

Quick answer
NSCP 2015 design basis (AISC 360-10); typhoon wind design governs exposed sites. Supplier pages for this market quote FOB $25–65/m² (Laotie, Nov 2026). Design basis for Manila: NSCP 2015 (AISC 360-10 basis); typhoon wind design. Ships via Manila (ocean freight China→SE Asia typically 1–2 weeks). The Southeast Asia hub carries the full buying guide.
Delivering to Manila
The route is fabrication in Cangzhou, container packing in erection sequence, then sea freight to Manila — ocean freight China→SE Asia typically 1–2 weeks — and the inland leg to the Manila site. The document pack travels with the shipment: drawings and calculations to the design basis above, EN 10204 3.1 mill certificates, welding and inspection records, and a packing list matched to the erection drawings.
Climate and specification: Tropical humidity, monsoon wind loads and coastal corrosion; typhoon wind design in the Philippines and Vietnam.
What to build here
The Southeast Asia hub links the building types with live demand in this market — warehouse and factory first. Start from the type hub for specifications and dated price bands, then bring the Manila site details (plot, soil, access) to the quotation.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
Do you ship to Southeast Asia?
Yes — Manila / Ho Chi Minh City / Bangkok / Jakarta / Port Klang: ocean freight China→SE Asia typically 1–2 weeks. Duty varies by country — confirm per product.
What does the price for a steel building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page