Type × market · Transactional + local
Warehouse in Kenya

Quick answer
A steel warehouse for Kenya prices from the type band — $26–42/m² frame (November 2026) — landed through Mombasa, then Nairobi–Mombasa corridor (ocean freight China→Africa typically 3–5 weeks). Design basis: Kenya building code; Eurocode-based design accepted. Duty confirmed with your clearing agent.
Why Kenya changes the warehouse specification
Climate: Coastal corrosion at Mombasa; mild highland climate in Nairobi — coating specification differs by site.
The strongest Africa evidence base: a dedicated 2026 Kenya cost guide puts complete installed warehouses at $95–140/m² (KES 12,300–18,200), kits ex-factory at $45–75/m² and frame-only at $22–35/m².
The building, as specified on the hub
The single most-searched and most-winnable building in the export market: a single-storey portal-frame kit, priced by span, eave height and cladding scope, shipped as a bolted package and erected by a local crew.
- Dock levellers & sectional doors
- Mezzanine floor
- PIR or rock-wool sandwich panels
- Skylights & turbo ventilators
Price this building for your port
Dimensions, destination, crane and cladding scope — send what you have, and the reply is an itemised quotation or one specific question.
Delivery & documents
Route: fabrication in Cangzhou → container packing in erection sequence → Mombasa, then Nairobi–Mombasa corridor. Document pack: drawings and calculations to the code above, mill certificates (EN 10204 3.1), welding and inspection records, packing list — plus the destination conformity route described on the Kenya market page.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
Do you ship to Kenya?
Yes — Mombasa, then Nairobi–Mombasa corridor: ocean freight China→Africa typically 3–5 weeks. Duty confirmed with your clearing agent.
What does the price for a steel warehouse include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page