Sizes & configurations · Transactional (size)

Steel Factory with 10-Ton Crane

Steel building — Steel Factory with 10-Ton Crane
DESIGN VISUALISATION

Quick answer

At 10 tons the crane stops being an accessory and becomes a primary structure: on 30–40 m spans the frame band moves to $48–70/m² FOB (Laotie clear-span guide, 2026). Promisteel's cost work shows stepping crane capacity from 5 t to 32 t adds roughly 25–40 tonnes of steel — about $20,000–35,000 on an 80 m building.

The design note

If the 10 t lift happens twice a year, a mobile crane or a split building is usually cheaper — ask us to price both.

Price it exactly

For this size the planning figures are 30–40 m span with 10 t crane: $48–70/m² frame FOB (Laotie) — on see crane cost-adder guide at Heavier columns + runway. They are starting points with sources named, not a quotation: run your exact dimensions through the calculator for a first estimate on the same method, then send the brief for an itemised quotation with the tonnage and kg/m² stated for your building, your cladding scope and your port.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for this size of building include?

Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page