Sizes & configurations · Transactional (size)

Steel Factory with 20-Ton Crane

Steel building — Steel Factory with 20-Ton Crane
DESIGN VISUALISATION

Quick answer

A 20-ton crane on a wide span is the heavy end of the PEB range: $70–100/m² frame FOB at 50–60 m spans (Laotie, 2026). Column design, runway girder depth and building stiffness all follow the crane — which is why this page exists separately from the 5-ton page: the answers are genuinely different.

The design note

Crane surge and end-stop loads belong in the first design brief, not in a revision.

Price it exactly

For this size the planning figures are 50–60 m span with 20 t crane: $70–100/m² frame FOB (Laotie) — on project-specific at Heavy runway design. They are starting points with sources named, not a quotation: run your exact dimensions through the calculator for a first estimate on the same method, then send the brief for an itemised quotation with the tonnage and kg/m² stated for your building, your cladding scope and your port.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for this size of building include?

Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page