Sizes & configurations · Transactional (size)
Clear Span 30 m Steel Building

Quick answer
Thirty metres clear span is the workhorse of the export range: no internal columns, frame pricing of $30–45/m² FOB without a crane (Laotie clear-span guide, 2026), and standard portal-frame engineering. Adding a 10-ton crane at 30–40 m spans moves the band to $48–70/m².
The design note
Above 30 m, every extra metre of span costs disproportionately more steel — price 24 m and 30 m side by side before deciding.
Price it exactly
For this size the planning figures are $30–45/m² frame FOB, no crane (Laotie) — on per length at 30–38 kg/m². They are starting points with sources named, not a quotation: run your exact dimensions through the calculator for a first estimate on the same method, then send the brief for an itemised quotation with the tonnage and kg/m² stated for your building, your cladding scope and your port.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for this size of building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page