How to install an aircraft hangar — erection sequence and crew

Steel building — an aircraft hangar
DESIGN VISUALISATION

Quick answer

Hangar erection is a heavy-lift programme: columns and wall frames first, then the roof structure — truss or space frame assembled at ground level where the design allows and lifted in large sections — and the door system last, hung from a finished, surveyed opening. Rigging engineering is part of the erection design, not a site improvisation.

In detail

Erection loads are checked on the same model as service loads — ask to see the erection method statement before the first lift.

Door installation is a specialist finish: track alignment and seal compression decide whether a 60 m door moves with one motor or three men.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for an aircraft hangar include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.