Guides & how-to · Question / AEO
What information is needed for an aircraft hangar quotation?

Quick answer
A hangar quotation starts from the aircraft, not the floor: largest tail height sets the door head, the door opening sets the span, and the fleet sets the depth. Add destination, cladding scope and any maintenance-crane or fall-arrest requirements (HF Steel quotation guides). A hangar brief that opens with square metres has skipped the three numbers that price it.
In detail
Door type — sliding, vertical-lift, fabric — is a quotation input, not a detail: it is a major cost line and it loads the frame differently.
Apron and taxiway constraints fix the door side and swing; a site plan settles arguments dimensions cannot.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for an aircraft hangar include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.