Guides & how-to · Question / AEO
How to compare quotations for a light steel villa without being misled

Quick answer
Compare light steel villa quotations on scope before numbers: structure-only kit, weathertight shell or finished villa — the three differ by multiples ($25–40/m² structure-only against $150–300/m² finished listings). Inside one scope, compare wall build-ups layer by layer, insulation values and the finish list. A villa comparison across scopes compares different products at the same address.
In detail
Ask each bidder to mark the finish boundary on the drawings — the line where their price stops is the most important line in a villa bid.
MEP and joinery inclusions decide finished-villa comparisons; they are lists, not adjectives, and should arrive as lists.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a light steel villa include?
Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page