Guides & how-to · Question / AEO
Design checklist for a light steel villa — span, eave, crane, panels, doors

Quick answer
The light steel villa design checklist is layout-led: room schedule and storeys; wall build-up layers and insulation target; finish boundary — structure, shell or finished; roof form and covering; majlis and courtyard arrangement; municipality style conditions; plot orientation for heat. Frame items are few because the system is standard; the villa is decided in its layout and its layers.
In detail
Orientation and shading are free insulation in Gulf climates — the checklist puts plot orientation on it for that reason.
Compound villas add repetition decisions: one layout repeated, or variants — priced very differently at the roll-forming line.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a light steel villa include?
Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page