How to install a light steel villa — erection sequence and crew

Quick answer
Villa erection is framing, not heavy steelwork: light-gauge wall panels stand on the slab, floor and roof cassettes follow, and the building is weathertight before services and finishes begin. Small crews, hand tools and a crane only for roof units — the pace is set by the finish trades behind the frame, not by the frame itself.
In detail
Slab accuracy is the villa's foundation question: light-gauge walls forgive millimetres, not centimetres — survey the slab before the kit lands.
Structure-only buyers hand over at weathertight stage; finished-villa programmes carry the fit-out sequence in the same plan.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a light steel villa include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page