How much does a PEB building cost per square metre in 2026?

Quick answer
A PEB building prices from the published FOB bands: $25–45/m² frame, $60–90/m² complete envelope, $90–150/m² turnkey package (Laotie price guide, November 2026), at 25–35 kg/m² for standard spans. 'PEB' names the engineering method, not a cheaper product — the same bands price the same building described as a steel warehouse.
In detail
Where a PEB quote beats the band, look for the missing scope — secondary steel, bracing, anchor bolts — before crediting the engineering.
The price guide converts between frame, envelope and turnkey scopes; the calculator gives a first estimate on your own dimensions.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a PEB building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.