Quick answer

For a sandwich panel building, the span decision is made by the frame behind the panels — multi-span saves the usual 15–30% (Promisteel, 2026) — but panels add one wrinkle: panel lengths and fixing spans follow the frame grid, so the grid decision also sets panel waste. Optimise frame and panel layouts together, or each optimum taxes the other.

In detail

Internal columns inside a panelled envelope are a flashing and sealing detail, not an obstacle — the envelope stays continuous around them.

Long clear spans with panels are routine; the panel choice (core, thickness) follows climate and fire duty, not the span.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a sandwich panel building include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.