Guides & how-to · Question / AEO
How to compare quotations for a sandwich panel building without being misled

Quick answer
Compare sandwich panel quotations panel by panel: core material, thickness, U-value basis, facing gauge and coating, fire performance — then the frame behind them on the standard fingerprints (HF Steel quotation guides). Panel totals hide specification swaps better than any other line in steel building: a thinner core is invisible in a lump sum and permanent in the energy bill.
In detail
Fixing system (through-fix against concealed) and panel length optimisation change both price and waste — ask for the panel layout, not just the area rate.
For cold-duty panels, add vapour-sealing scope to the comparison; for fire-duty, the test basis.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a sandwich panel building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page