Guides & how-to · Question / AEO
Design checklist for a sandwich panel building — span, eave, crane, panels, doors

Quick answer
The sandwich panel design checklist is specification-led: core material against fire and temperature duty; thickness against U-value target; panel lengths against the frame grid (the two optimise together or tax each other); fixing system; facing profile and colour; joint and vapour-sealing scope; door and louvre openings drawn into the schedule, not cut on site.
In detail
Fire duty can split the specification — rock wool at compartments, PIR elsewhere — and the checklist is where that split is drawn.
Spare panels belong on the checklist: colour and profile matching later costs more than panels stored now.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a sandwich panel building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page