Quick answer
A sandwich panel building's foundations are its frame's foundations — pads or strips from issued reactions — with one envelope consequence: panel plumb starts at the base channel, and the base channel starts at the slab edge. Slab edge accuracy and level are panel-quality inputs — the first panel joint is effectively cast in concrete, not fixed on site.
In detail
Cold-duty buildings add the insulated slab system — drawn with the foundation package, as the cold storage foundation guide sets out.
Foundations remain local scope on our reaction schedule; the base-channel setting drawings issue with the approval set.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a sandwich panel building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.