Guides & how-to · Question / AEO
How to reduce the cost of a sandwich panel building without cutting safety

Quick answer
Reduce a sandwich panel building's cost at the specification split: rock wool only where fire duty requires it, PIR elsewhere; thickness per temperature zone, not one maximum throughout; panel lengths optimised against the frame grid so waste falls with the frame's own optimisation. Then the frame levers (multi-span 15–30%, bay spacing 3–7%; Promisteel, 2026).
In detail
Panel waste is a design output: a grid chosen without the panel module pays for offcuts on every wall.
Single-skin sheeting with blanket insulation is the honest economy option for unconditioned buildings — priced openly against panels, not substituted silently.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a sandwich panel building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.