How is a sandwich panel building shipped from China — and in how many containers?

Steel building — a sandwich panel building
DESIGN VISUALISATION

Quick answer

A sandwich panel building ships its frame as dense steel bundles and its panels as the opposite: light, bulky packs that set the container count by volume. Panels travel flat, faced and edge-protected, in wall order. Damage control is the shipping specification — a panel creased in transit is a wall with a scar, replaced at freight speed.

In detail

Order spare panels in the original shipment — matching colour and profile a year later costs more than the panels do now.

Sea times run by region (JA Steel); panels should be erected soon after landing, so sailings are planned against the frame's erection date.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a sandwich panel building include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.