Guides & how-to · Question / AEO

How to compare quotations for a steel warehouse without being misled

Steel building — a steel warehouse
DESIGN VISUALISATION

Quick answer

Compare warehouse quotations on the engineering fingerprints: tonnage and kg/m² against the 25–35 kg/m² warehouse band, span and eave as stated, coating system, and the exclusion list (HF Steel quotation guides). Convert every bid to the same basis and scope first. A bid 20% cheaper and 20% lighter is not cheaper — it is a different building.

In detail

Anchor bolts, erection bolts, spare panels and touch-up paint are the classic silent exclusions — ask for each by name.

The worked example prices a 5,000 m² warehouse line by line; hold every bid up against its structure.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel warehouse include?

Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page