What makes up the total cost of a steel warehouse, line by line?

Quick answer
A warehouse's total cost splits into the steel package (frame 30–45% of finished cost, per the JX Steel Structure 2026 guide), cladding and accessories, freight and duty, foundations, and erection. The steel package is the only part a FOB quotation covers — this breakdown shows every line, so a FOB-based budget does not omit the other half.
In detail
Foundations and erection are local costs with local prices; freight is a design output (container count).
Use the worked-example guide to see the same lines priced on a 5,000 m² building.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel warehouse include?
Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.