Guides & how-to · Question / AEO

Design checklist for a steel warehouse — span, eave, crane, panels, doors

Steel building — a steel warehouse
DESIGN VISUALISATION

Quick answer

The warehouse design checklist: span against the racking plan; eave height against the tallest rack and truck; bay spacing — a 3–7% cost lever (Promisteel, 2026); dock count and door sizes against vehicle flow; cladding against temperature duty; mezzanine intent; extension direction. Each item is a priced decision, and the cheap time to make it is now.

In detail

Decide the extension direction at design: a removable end wall costs little now and a fortune later.

The brief builder on this site is this checklist in form form — five minutes, no obligation.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel warehouse include?

Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page