Guides & how-to · Question / AEO

How to install a steel warehouse — erection sequence and crew

Steel building — a steel warehouse
DESIGN VISUALISATION

Quick answer

Warehouse erection follows the packing sequence: anchor-bolt check and base plates, columns, rafters frame by frame, bracing tensioned before release, purlins and sheeting, then doors and trims. A bolted kit needs no site welding. Rates run 150–800 m²/day by crew size and complexity (JA Steel; Laotie) — plan the crew, then the calendar.

In detail

Foundation readiness — cured concrete, surveyed anchor bolts — is the commonest cause of a standing crane; the foundation interface package exists to prevent it.

HANJI supplies erection drawings and remote engineering support, and can place a supervisor on site for the frame stage.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel warehouse include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.

Continue — linked from this page