Guides & how-to · Question / AEO
How to compare quotations for a PEB building without being misled

Quick answer
Compare PEB quotations on the optimisation outputs: tonnage and kg/m² at your span, bay spacing assumed, section tapering, coating system and the exclusion list (HF Steel quotation guides). PEB bids are design proposals wearing prices — the lightest bid at the same loads and code is the best engineering, and the lightest bid without them is just less building.
In detail
Demand the design basis in writing on every bid — code, loads, deflection limits; PEB comparisons without it compare software settings.
Bay spacing differs between bids more often than buyers notice, and it moves foundations as well as frames: compare the whole system.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a PEB building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page