Guides & how-to · Question / AEO

Design checklist for a PEB building — span, eave, crane, panels, doors

Steel building — a PEB building
DESIGN VISUALISATION

Quick answer

The PEB design checklist names the manufacturer's freedoms and the buyer's decisions separately: buyer — span arrangement, eave, crane, cladding, doors, extension direction; manufacturer — bay spacing optimisation (a 3–7% lever, Promisteel 2026), section tapering, connection standardisation. A good PEB brief is short because the system carries the rest — but the buyer's six items must be in it.

In detail

Future extension is the checklist item with the worst late price: decide the direction now, even if the extension is never built.

Deflection and serviceability limits belong in the brief where cladding or cranes are sensitive to them — the system optimises to the limits it is given.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a PEB building include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.