What foundation does a PEB building need?

Quick answer
A PEB building's foundations are designed from the manufacturer's reaction schedule — that is the system's contract: we issue base reactions, anchor plans and setting templates with the approval drawings; your local contractor designs and pours the concrete to local code. Anchor accuracy is the whole game: a PEB frame assembles on surveyed bolts or not at all.
In detail
Hairpin ties and slab design interact with frame thrust on portal buildings — the reaction schedule states horizontal loads explicitly for this reason.
Send the soil report at enquiry: footing type is the one design input the steel supplier cannot optimise around.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a PEB building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page