How to install a PEB building — erection sequence and crew

Quick answer
PEB erection is the system working as designed: anchor check, columns, haunched rafters bolted at end plates, bracing before release, purlins, sheeting, trims. No site welding, no member modification — the kit was engineered to assemble. Rates run 150–800 m²/day by crew and complexity (JA Steel; Laotie); a trained local crew with the sequence drawings is the whole secret.
In detail
The commonest PEB site failure is sequence, not steel: bracing skipped 'until later' leaves frames to be re-plumbed at cladding stage.
Foundation readiness decides the start: surveyed anchor bolts and cured concrete before the first container opens.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a PEB building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.