Guides & how-to · Question / AEO
What information is needed for a PEB building quotation?

Quick answer
A PEB quotation needs the same five inputs as any steel building — dimensions, destination, crane if any, cladding scope, drawings if they exist (HF Steel quotation guides) — plus one PEB-specific item: which decisions the buyer wants optimised. Bay spacing, span arrangement and section tapering are the manufacturer's design freedom; naming the priority (weight, speed, future extension) aims it.
In detail
Future extension direction is the cheapest input on the list: a removable end wall costs little at design and a fortune later.
The brief builder collects the five core inputs in order; the optimisation conversation follows from your answers.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a PEB building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page