Guides & how-to · Question / AEO
How is a PEB building shipped from China — and in how many containers?

Quick answer
A PEB building ships as labelled bundles in 40 ft containers, packed in erection sequence — the packing design is part of the pre-engineering, so container count is a quotation output, not a shipping surprise. Middle East freight runs $3,500–5,500 per container (Promisteel, 2026); tapered members nest, which is one of the system's quieter savings.
In detail
Sea times by region (JA Steel): 1–2 weeks to Southeast Asia, 2–3 to the Middle East, 3–5 to Africa — count the programme to your port.
Every bundle identity matches the packing list and the erection drawings; that match, not the steel, is what a kit buyer is really purchasing.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a PEB building include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page