Quick answer

A steel building kit prices ex-factory at $45–75/m² for a complete package in the Africa guides (Kenya cost guide, 2026), against $25–45/m² frame-only FOB (Laotie, November 2026). 'Kit' means everything to the site gate: frame, cladding, doors and fixings, packed for containers. Freight, duty and erection sit outside the kit price everywhere.

In detail

Kenya publishes the full ladder — frame-only $22–35/m², kit ex-factory $45–75/m², installed $95–140/m² — and confusing the three rungs is the commonest buying error in that market.

A kit quotation should state the container count it assumes; the shipping guide explains how packing design sets it.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel building kit include?

Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.