A steel building kit — clear span vs multi-span: which is cheaper?

Steel building — a steel building kit
DESIGN VISUALISATION

Quick answer

For a steel building kit, price the span question before the kit is packed: multi-span saves typically 15–30% against clear span (Promisteel, 2026), and the saving survives shipping — fewer, lighter members pack better. But a kit is erected once and used for decades; if the operation needs the clear floor, buy it.

In detail

Kit quotations should show both layouts' container counts — the freight difference is part of the span decision, not an afterthought.

Columns in a kit are just more bundles; the erection sequence drawings place them on racking or process lines where they cost nothing.

Questions buyers ask

FAQ

Are you a factory or a trading company?

HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.

Can I inspect before shipment?

Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.

What does the price for a steel building kit include?

Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.