How to compare quotations for a steel building kit without being misled

Quick answer
Compare steel building kits on completeness: the packing list against the building — frame, cladding, doors, bolts, spares, touch-up paint — then container count and freight basis, then the steel fingerprints (HF Steel quotation guides). Kit bids fail at the edges: the missing 2% is discovered at 40 m of erected frame, priced in crane days.
In detail
Erection support is a comparison line: drawings quality, remote engineering help, supervisor availability — priced or absent, they belong in the table.
Convert kit prices to the same delivery basis before ranking: ex-factory, FOB and CIF kit prices differ by the freight the buyer still owes.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel building kit include?
Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.