Design checklist for a steel building kit — span, eave, crane, panels, doors

Quick answer
The steel building kit design checklist adds logistics to the building list: the building items (span, eave, crane, cladding, doors) plus packing sequence against erection order; container count against the freight budget; what the first container must hold; spares and touch-up scope; and the erection support expected. A kit is designed twice — once as a building, once as cargo.
In detail
Phasing decisions — frame first or complete phases — are checklist items because they change both the packing design and the cash flow.
Local supply boundaries (what the destination market provides cheaper) belong on the list; the kit should not ship what the site town sells.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel building kit include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.