What foundation does a steel building kit need?

Quick answer
A steel building kit arrives to foundations the buyer has already poured — which makes the foundation package the kit's first delivery: reaction schedule, anchor plans and setting templates, issued at design stage so local concrete cures while the steel is still on the line. The kit cannot fix a foundation; it can only arrive to a ready one.
In detail
Anchor-bolt survey results should travel back before the ship sails — a mismatch found in Cangzhou is a drawing fix; found on site, it is a programme event.
Soil reports belong in the kit enquiry for the same reason: footing type decides the anchor package the kit must carry.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel building kit include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.