How to install a steel building kit — erection sequence and crew

Quick answer
Kit installation is assembly by document: the packing list and erection drawings sequence every bundle — anchors, columns, frames, bracing, secondary steel, cladding, doors — and the building rises in container order. No site welding, no fabrication on site. What the kit asks of the buyer is a ready foundation, a crane, and a crew that follows the sequence.
In detail
Rates run 150–800 m²/day by crew and complexity (JA Steel; Laotie) — a first-time crew should plan at the careful end and bank the learning on building two.
Remote engineering support runs through erection; a supervisor can be placed on site for the frame stage where the project justifies it.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel building kit include?
Only what its scope line says: scope (frame, envelope or turnkey), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.