Guides & how-to · Question / AEO
How is a steel building kit shipped from China — and in how many containers?

Quick answer
A steel building kit is defined by its shipping: everything — frame, cladding, doors, bolts, spares — packed in erection sequence into 40 ft containers, with a loading survey before the doors close. Container count is quoted with the kit (Middle East freight $3,500–5,500 per container, Promisteel 2026), and the packing list is the erection manual's first chapter.
In detail
Phased kits ship frame first and cladding behind it — a cash-flow and site-storage decision made at quotation, not at the port.
Kenya's published ladder (kit ex-factory $45–75/m², installed $95–140/m²) shows what sits outside the kit price: freight, duty, foundations, erection.
Questions buyers ask
FAQ
Are you a factory or a trading company?
HANJI Steel Structures is operated by Jiangsu Hanji Supply Chain Co., Ltd. — design and fabrication are our own work, from Cangzhou, Hebei. Products outside our line (specialist doors, refrigeration, fit-out) are named in the scope as coordinated supply.
Can I inspect before shipment?
Yes — your own visit or a third-party inspector (SGS, Bureau Veritas) at agreed hold points, before the balance is paid.
What does the price for a steel building kit include?
Only what its scope line says: scope (frame, envelope, or envelope with accessories), basis (FOB, CIF or installed) and date are stated on every figure — the FOB vs CIF guide explains the ladder.
Continue — linked from this page